online_modified_einstein:   Total sediment discharge by the Modified Einstein Procedure


References

  1. Einstein, H. A., 1950. The bed-load function for sediment transportation in open channel flows. USDA Soil Conservation Service, Technical Bulletin No. 1026, Washington, D.C., September.

  2. Colby, B. R. and C. H. Hembree, 1955. Computations of total sediment discharge, Niobrara river, near Cody, Nebraska. U.S. Geological Survey Water Supply Paper 1357, Washington, D.C.

  3. U.S. Bureau of Reclamation, 1955. Step method for computing total sediment load by the Modified Einstein Procedure. Sedimentation Section, Hydrology Branch, Project Investigations Division, July.

  4. U.S. Bureau of Reclamation, 1966. Computation of "Z's" for use in the Modified Einstein Procedure. Sedimentation Section, Hydrology Branch, Project Investigations Division, June.


SAMPLE INPUT

[Rationale]     [Procedure]     [Features]     [Main Page]

Stream or river:   Niobrara river, near Cody, Nebraska

U.S. Customary Units.


1. Discharge Q [cfs]:      230

2. Mean velocity u [fps]:      2.08

3. Average depth d [ft]:      0.98

4. Width w [ft]:      113

5. Flow area A [ft2]:      111

6. Water temperature t [oF]:      64

7. Kinematic viscosity ν [ft2/s]:      0.00001153

8. Diameter D65 [ft]:      0.00105

9. Diameter D35 [ft]:      0.00075

10. Measured concentration C [ppm]:      262

11. Sampled suspended load Qsm [tons/day]:      163

12. Vertical distance not sampled dn [ft]:      0.3

13. Mean water depth at sampled verticals ds [ft]:      1.22


14. Number of size fractions:     Normal

15. Fraction of bed material in each size range ib (9 values):      0.,0.,0.38,0.50,0.05,0.01,0.01,0.,0.

16. Percentage of suspended material in each size range Q's (9 values):      22.,25.,42.,11.,0.,0.,0.,0.,0.

17. Z' mode of computation:     USBR (1955).


SAMPLE OUTPUT:

Stream or river: Niobrara river, near Cody, Nebraska


•   U.S. Customary Units.   •   Number of size fractions:  Normal (9)   •   USBR (1955) Z' mode of computation   •   Computed load (Column 24) in T/D units (tons/day)   •

•   RS = 0.000226   •   u'* = 0.0853   •   δ = 0.00157   •   ks/δ = 0.67   •   x = 1.53   •   P = 10.7   •   A' = 0.246   •

•   Percentage of flow in sampled zone = 80%   •   Sediment discharge through the sampled zone Q's = 130 tons/day   •

•   Reference size fraction D = 0.00058 ft   •   Reference size fraction Z' = 0.76   •


123456789101112131415161718192021222324
Size
fraction
(mm)
D
(mm)
D
(ft)
ψφ*/21200 D3/2ibibqb43.2 wiBQB

(T/D)

% Size
Q's
Q's

(T/D)

Mult.Z'A"J'1-J'2J"1-J"2PJ"1+J"2
________

PJ'1+J'2

I"1-I"2PI"1+I"2

+1

Computed
load

(T/D)

0.002-0.06250.01120.0000375.490.25710.000270.0.0000004,8820.0022.028.60.0250.0190.0000750.740.401.011.041.23   35.3
0.0625-0.1250.08840.000295.490.25710.005930.0.0000004,8820.0025.0 32.50.4380.330.000590.630.431.222.021.62   52.5
0.125-0.250.1770.000585.490.25710.01680.380.0016374,8827.9942.054.61.0000.760.00118     2.938.5023.78190.0
0.25-0.50.3540.001165.490.25710.04740.500.0060934,88229.7511.014.31.771.340.00237     0.502.074.31128.2
0.5-10.7070.002326.790.14670.13410.050.0009844,8824.800.00.02.571.950.00473     0.220.872.4511.8
1-21.410.0046413.580.01270.37930.010.000484,8820.240.00.03.432.610.00947     0.140.551.940.5
2-42.830.0092827.150.00001.07270.010.0000004,8820.000.00.04.453.380.01894     0.090.311.640.0
4-85.660.0185654.300.00003.03400.0.0000004,8820.000.00.05.704.330.03788     0.060.181.460.0
8-1611.310.03712108.600.00008.58160.0.0000004,8820.000.00.07.285.530.07575     0.040.101.350.0
Total         100130           418.3