CIV E 634 Surface-water Hydrology --- Fall 2018 --- Syllabus
A. Water Balance (2 weeks) |
A01. Ponce, V. M., and the Late A. B. Palaniappan. 1993-2014.
Facets of hydrology.
|
A02. Ponce, V. M. 2010.
Factors affecting precipitation.
|
A03. Ponce, V. M. 2010.
Water balance figures.
|
A04. Ponce, V. M. 201.
L'vovich's water balance.
|
A05. Ponce, V. M., and A. V. Shetty. 1995.
A conceptual model of catchment water balance: 1. Formulation
and Calibration.
|
A06. Ponce, V. M., and A. V. Shetty. 1995.
A conceptual model of catchment water balance: 2. Application to runoff and baseflow modeling.
|
A07. Ponce, V. M. 2018.
Why is the cybernetic hydrologic balance
better suited for yield hydrology
than the conventional approach?
|
A08. Ponce, V. M. 2018.
How much water could be pumped
from an aquifer and still remain
sustainable?
|
A09. Ponce, V. M. 2010.
Catchment wetting and water balance.
|
A10. Ponce, V. M. 2010.
Water balance using catchment wetting.
|
A11. Ponce, V. M. 2010.
Water balance to determine groundwater recharge coefficient.
|
A12. Penman, H. L. 1970.
The water cycle.
|
A13. Ponce, V. M. 1992.
Letter to South American Explorer.
|
B. Evapotranspiration (1 week) |
B01. Ponce, V. M. 2014. Evaporation and evapotranspiration.
|
|
B02. Ponce, V. M. 2011. Evaporation. (Video)
|
B03. Ponce, V. M. 2011. Evapotranspiration. (Video)
|
B04. Ponce, V. M. 2014. The Penman-Montieth method.
|
B05. Ponce, V. M. 2007. Penman calculator.
|
B06. Ponce, V. M. 2014. The psychrometric constant.
|
B07. Ponce, V. M. 2007. Thornthwaite calculator.
|
B08. Ponce, V. M. 2007. Penman-Montieth calculator.
|
B09. Ponce, V. M. 2009. Penman-Montieth calculator for ecosystems.
|
B10. Aguilar, R. D., and V. M. Ponce,
2013. Evapotranspiration using the Shuttleworth-Wallace method.
|
B11. Aguilar, R. D., and V, M. Ponce. 2013.
Shuttleworth-Wallace calculator.
|
C. Infiltration (1 week) |
C01. Ponce, V. M. 2011. Hydrologic Abstractions. (Video)
|
C02. Ponce, V. M. and R. H. Hawkins. 1996. Runoff curve number: Has it reached maturity?
|
C03. Several authors. 1997. Discussion to Runoff curve number:
Has it reached maturity?
|
C04. Ponce, V. M. and R. H. Hawkins. 1997. Closure to Runoff curve number:
Has it reached maturity?
|
C05. Ponce, V. M. 1996. Notes of my conversation with Vic Mockus. In NRCS website.
|
C06. Rezaeianzadeh, Mehdi. 2017.
Paper on curve number 01 (Draft).
|
C07. Rezaeianzadeh, Mehdi. 2017.
Paper on curve number 02 (Draft).
|
C08. Ponce, V. M., and L. Magallon. 2015.
Initial abstraction revisited..
|
C09. Ponce, V. M. 1996.
Hydrologists of the third kind.
|
D. Overland flow (1 week) |
D01. Ponce, V. M. 2011. The catchment. (Video)
|
D02. Ponce, V. M. 2011. Runoff. (Video)
|
D03. Ponce, V. M., O. I. Cordero-Brana, and S. Y. Hasenin. 1997. Generalized conceptual modeling
of dimensionless overland flow hydrographs.
|
D04. Ponce, V. M. 2014. Calculation of conceptual dimensionless overland flow hydrographs.
|
D05. Papadakis, C. N., and M. N. Kazan. 1987. Time of concentration in small rural watersheds.
|
D06. Ponce, V. M., and A. C. Klabunde. 1999.
Parking lot storage modeling using diffusion waves.
|
D07. Aguilar, R. D., 2014.
Diffusion wave modeling of catchment dynamics using online calculation.
|
D08. Aguilar, R. D., and V. M. Ponce. 2014.
Overland flow using the diffusion wave method.
|
E. Hydroclimatology (2 weeks) |
E01. Ponce, V. M., A. K. Lohani, and P. T. Huston. 1997. Surface albedo and water resources: Hydroclimatological impact of human activities.
|
E02. Ponce, V. M., A. K. Lohani, and P. T. Huston. 1997. Budyko's hydroclimatological model of a coupled land surface-atmosphere system.
|
E03. Ponce, V. M. 2003. The Sahel, Africa.
|
E04. Ponce, V. M. 2003. Advective precipitation.
|
E05. Ponce, V. M. 2010. Is vegetation paying its own way?
|
E06. Ponce, V. M. 2011. Is vegetation paying its own way? (Video)
|
E07. Ponce, V. M. 1995. The ARS lab in Tucson.
|
E08. Ponce, V. M. 2009.
The untimely drought.
|
E09. Ponce, V. M., and A. V. Shetty. 2009. The facts about El Niño.
|
E10. Ponce, V. M. 2007. Q & A on the return period to be used for design.
|
E11. ASCE. 2007. The ASCE Hurricane Katrina External Review Panel Report.
|
E12. ASCE. 2007. Quote from the ASCE Hurricane Katrina External Review Panel Report (page 73).
|
E13. Ponce, V. M. 2007. The ford-bridge: Sustainable river crossings in arid regions.
|
E14. Ponce, V. M. 2013. The ford-bridge. (Video)
|
E15. Hoover, L. 2005. Mohave river flood of March 2005.
|
E16. Ponce, V. M., R. P. Pandey, and S. Ercan. 2008. Characterization of drought across climatic spectrum.
|
E17. Ponce, V. M., R. P. Pandey, and S. Ercan. 2008. A conceptual model of
drought characterization across the climatic spectrum.
|
E18. Shetty, A. V., A. Taher-Shamsi, V. M. Ponce, and R. Garcia-Cueto. 2002.
Drought characterization in the Ojos Negros region,
Baja California, Mexico.
|
E19. Ponce, V. M. 1995. Management of floods and droughts in the semiarid Brazilian
Northeast: The case for conservation.
|
E20. Ponce, V. M. 2014. The 800-mm isohyet: Health and hope.
|
E21. Ponce, V. M. 2014. The 800-mm isohyet: Health and hope. (Video)
|
E22. Ponce, V. M. 2004. Drought, in
Three issues of sustainable management in the Ojos Negros valley,
Baja California, Mexico.
|
F. Baseflow augmentation (1 week) |
F01. Ponce, V. M., and D. S. Lindquist. 1990. Management of baseflow augmentation: A review.
|
F02. Ponce, V. M. 1989. Baseflow augmentation by streambank storage: Literature review and annotated bibliography.
|
F03. Ponce, V. M. 2004. Camp Creek 15-yr assessment.
|
F04. Ponce, V. M. 2004. Severance reservoir 15-yr assessment.
|
F05. Ponce, V. M. 2007. Red Clover Creek: Past and Present.
|
F06. Ponce, V. M. 2007. The Story of Red Clover Creek, Plumas County, California.
|
F07. Ponce, V. M. et al.. 2013. Regional aquifer parameters using baseflow recession.
|
F08. Ponce, V. M. 2014.
Surface-subsurface flow interaction.
|
F09. Ponce, V. M., et al. 2014.
Effect of groundwater pumping on the health of arid vegetative ecosystems.
|
Week 9: Midterm Exam
|
G. Catchment routing (3 weeks) |
G01. Ponce, V. M. 2014. The Pfasfstetter coding system
for watershed identification.
|
G02. Ponce, V. M. 2010. The source of the Missouri river.
|
G03. Ponce, V. M. 2014. Runoff diffusion reexamined.
|
G04. Ponce, V. M. 2011. Synthetic unit hydrographs explained.
|
G05. Ponce, V. M. 2011. Time-area method.
|
G06. Ponce, V. M. 2011. Time-area method. (Video)
|
G07. Ponce, V. M. 2011. Time-area method calculator.
|
G08. Ponce, V. M. 2011. Cascade of linear reservoirs.
|
G09. Ponce, V. M. 2011. Cascade of linear reservoirs. (Video)
|
G10. Ponce, V. M. 2011. Cascade of linear reservoirs calculator.
|
G11. Ponce, V. M. 2011. A general dimensionless unit hydrograph.
|
G12. Ponce, V. M. 2009. Cascade and convolution: One and the same.
|
G13. Woolhiser, D. A. 1996. Search for physically based runoff model: a hydrologic El Dorado?
|
G14. Ponce, V. M. 2011. Clark unit hydrogragh. (Video)
|
G15. Ponce, V. M., and N. R. Nuccitelli. 2013. Comparison of two types of Clark unit hydrograghs.
|
G16. Ponce, V. M., and N. R. Nuccitelli. 2013. Online routing Clark.
|
G17. Kull, D. A., and A. D. Feldman. 1998. Evolution of Clark's unit graph method to spatially distributed runoff.
|
G18. Hydrologic Engineering Center. 1998. HEC-HMS Muskingum-Cunge model.
|
G19. Ponce, V. M. 2013. Creager and flood wave diffusion.
|
G20. Ponce, V. M. 2005. Flood hydrology of the Binational Cottonwood Creek -
Arroyo Alamar, California and Baja California.
|
G21. Ponce, V. M., H. A. Castro, A. E. Espinoza,
R. Celis, and F. Perez. 2005. Flood hydrology of Tecate Creek, Tecate, Baja California, Mexico.
|
G22. Ponce, V. M. 2005. A hydrodynamic watershed model.
|
H. Channel routing (2 week) |
H01. Ponce, V. M. 2008. La Leche river flood control project, Lambayeque, Peru: Flood hydrology.
|
H02. Ponce, V. M., R. P. Pandey, and S. Kumar. 1999.
Groundwater recharge by channel infiltration in El Barbon basin,
Baja California, Mexico.
|
H03. Ponce, V. M. 2011. Muskingum method. (Video)
|
H04. Ponce, V. M. 2011. Kinematic waves. (Video)
|
H05. Ponce, V. M. 2011. Kinematic wave celerity. (Video)
|
H06. Ponce, V. M. 2011. Diffusion waves. (Video)
|
H07. Ponce, V. M. 2011. Muskingum-Cunge method. (Video)
|
H08. Vuppalapati, B., and V. M. Ponce, 2016.
Muskingum-Cunge
amplitude and phase portraits
with online computation.
|
H09. Ponce, V. M. 2011.
The Att-kin model.
|
H10. Ponce, V. M. 2011.
The competition between kinematic and dynamic waves.
|
H11. Ponce, V. M. 2011. Introduction to dynamic waves. (Video)
|
H12. Ponce, V. M. 2011.
Instability of the Preissmann scheme.
|
H13. Ponce, V. M. 2011.
Unsteady flow with HEC-RAS. (Video)
|
H14. Ponce, V. M. 2011.
Steady vs unsteady flow with HEC-RAS.
|
H15. Ponce, V. M. 2011.
Causes of runoff diffusion. (Video)
|
I. Climate change (2 weeks) |
I01. Ponce, V. M., and S. Kumar. 1999. Global climate change, sustainable development, and environmental ethics.
|
I02. Ponce, V. M. 2011. The global carbon cycle.
|
I03. Ponce, V. M. 2011. The 33 facts about global warming.
|
I04. Ponce, V. M. 2011. The science of global warming: Good, bad, or ugly?
|
I05. Ponce, V. M. 2011. Uncommon sense: The sense behind global warming.
|
I06. Ponce, V. M. 2014. Plants and animals: How many are they?
|
I07. Ponce, V. M. 2014. The global warming puzzle: How many people does one car amount to?
|
I08. Ponce, V. M. 2015. Effect of global climate change on the White Range of Peru
|
I09. Ponce, V. M. 2016. Data bank on the glaciers of the White Range of Peru
|
Week 17: Project Final Oral Presentations (Tuesday only)
|